New boarding areas

Boarding Area A. The new pier at the eastern end of the terminals system will be structured over two floors, dedicated to passengers. In total there will be 13 gates with loading bridges and 10 remote gates. The connection to T1 will be via an elevated passage which will lead to an extension of the Front portion of Terminal 1.

T3 Front portion and boarding area E. The project involves the creation of the front portion of T3 with an independent building connected to the existing terminals through a series of elevated walkways. The new front portion will host 8 boarding gates at apron level, boarding area E, service areas and VIP lounges on the two upper levels.